The project involved reorganisation of a linear sequence of rooms along an internal corridor to maximise light in all spaces and rationalise the balance of spaces. The focus was on the insertion of modern interventions that enhance the original features without mimicking them. A datum line that regularises a light pelmet, cabinet heights and door heights was introduced that visually unites the front of the flat with the rear.
|
|